Browse through our library of WSPS policies, annual reports, strategic plans and more.
Issue link: https://www.wsps.ca/resource-hub/i/1537399
18 | 310-BZN-01-ISDO Top 10 Primary Causal Factors Validations were completed between April 1 and 4, 2025 Rank # Category Primary Root-Cause Workshop Average Standard Deviation 1 Process Inadequate training 7.00 0.00 2 Environment Poor workstation design/layout 6.67 0.52 3 People Poor technique 6.00 0.63 3 Culture Lack of effective supervision 6.00 0.63 5 Measures Lack of evaluation of effectiveness of training 6.00 0.89 5 Environment Lack of storage capacity 6.00 0.89 7 People Fatigue 6.00 1.10 8 Process Inadequate/lack of safe work practices 5.83 0.41 8 Tools & Machines Incorrect use of/failure to use equipment 5.83 0.41 10 Process Inadequate staffing 5.83 0.75