Browse through our library of WSPS policies, annual reports, strategic plans and more.
Issue link: https://www.wsps.ca/resource-hub/i/1537399
73 | 310-BZN-01-ISDO 8. Tools & Machines – Incorrect Use of/Failure to Use Equipment Conduct thorough analysis during purchasing to ensure acquisition of the right equipment Implement a 3-step training process for equipment (employer demonstrates, we practice together, worker demonstrates) with verification of training Develop education campaign on taking the time to get the equipment – Consider catchy slogans, similar to "You got time to lean, you got time to clean" Position equipment where it is needed for use Coordinate a scheduling plan for shared equipment, to ensure different departments have access when they need it, promoting "good caring, good sharing"