Guides & Toolkits

Turkey Safe Work Practices Manual

This Stream includes all of our Guides & Toolkits Flipbooks.

Issue link: https://www.wsps.ca/resource-hub/i/1317310

Contents of this Issue

Navigation

Page 25 of 71

JUNE 2013 LOADING THIRD FLOOR Inspect pass through holes and load out equipment present in the barn Set up loading equipment in barn (Refer to Appendix B) Second fl oor - set up scaffold unit directly under pass through hole. Ensure scaffold is level and work platform is secure. Third fl oor - Remove fl oor panel and secure guard rail system around pass through hole. Catch and pass turkeys Personnel on third fl oor catch and pass turkeys through fl oor hole to personnel standing on scaffold (second fl oor). Individual on scaffold passes turkeys to personnel on second fl oor who carries birds out second fl oor load out doors where they are passed to personnel on the loading platform. STEP ACTION Second fl oor - determine location of openings for passing birds relative to load out doors (recommended minimum opening of 30 in. x 48 in. /76 cm x 122 cm). Ensure portable construction/industrial grade Canadian Standard Association (CSA) approved scaffold unit or equivalent with secured non-slip work platform and safety rails is present and setup on second fl oor. Ensure no equipment (feed or water lines) is present under fl oor opening that could impede workers. Third fl oor ensure guard rail system to place around fl oor openings is present. Pass through holes have been located and litter cleared from over the door. 24

Articles in this issue

Archives of this issue

view archives of Guides & Toolkits - Turkey Safe Work Practices Manual