JUNE 2013
Move loading equipment between
holes
(Refer to Appendix B)
When all turkeys around third fl oor pass through hole
have been caught:
■ remove safety guard rail around third fl oor opening;
■ replace and secure fl oor panel over fl oor opening; and,
■ move safety guard rail to next fl oor pass through and
repeat process.
Second fl oor - move scaffold unit to next pass through
hole; repeat set up directly under this opening.
Dismantle loading equipment When all birds on the third fl oor have been caught:
■ remove safety guard rail around third fl oor opening and
store;
■ replace and secure fl oor panel over pass through hole;
and,
■ remove second fl oor scaffold unit and store.
STEP ACTION
25