Arborist Industy Safe Work Practices Guide

This Stream includes all of our Guides & Toolkits Flipbooks.

Issue link: https://www.wsps.ca/resource-hub/i/1490496

Contents of this Issue

Navigation

Page 40 of 163

ASWP03 Ascending Trees 7.3.3 Final Anchor Point The final anchor point is where the arborist will secure their life line allowing the arborist mobility to work. The final anchor point is best situated as high in the tree as possible to allow mobility of the worker, similar to a pendulum. The final anchor point must meet the requirements of all anchor locations. Step Action Secure to tree using a work positioning lanyard Ensure that lanyard is secured • Check snaps, place weight into lanyard Remove friction hitch Adjust arborist life line to meet work requirements Secure arborist life line around main stem of tree and over a suitably strong limb Secure arborist life line to arborist using carabiner, termination knot or captive eye snap Tie friction hitch from list of approved hitches in Appendix D Test friction hitch • Slowly place weight into system. • Slippage of friction hitch requires redressing of hitch and retesting Release work positioning lanyard Page 41

Articles in this issue

Archives of this issue

view archives of Guides & Toolkits - Arborist Industy Safe Work Practices Guide