Guides & Toolkits

Arborist Industy Safe Work Practices Guide

This Stream includes all of our Guides & Toolkits Flipbooks.

Issue link: https://www.wsps.ca/resource-hub/i/1490496

Contents of this Issue

Navigation

Page 39 of 163

ASWP03 Ascending Trees Repeat action until reaching the interim anchor point 7.3.2 Interim Anchor Point Repositioning Arborist Life Line Once the arborist has climbed to the interim anchor point, the following action applies for continuing ascent Step Action Secure to tree using a work positioning lanyard Secure work positioning lanyard around the main stem of the tree or a suitably strong limb Ensure work positioning lanyard is secure Check snaps and place weight into the work positioning lanyard Remove friction hitch Reposition arborist life line to next interim anchor point The worker may use a rope poking tool, pole pruner or throwing knot to advance the rope up the tree. Secure arborist life line to arborist Test and or tie friction hitch from list of approved hitches in Appendix D • Slowly place weight into system • Re test split tail friction hitch • Tie and test friction hitch in conventional system Release work positioning lanyard Continue ascent Repeat interim anchor point process as required Page 40

Articles in this issue

Archives of this issue

view archives of Guides & Toolkits - Arborist Industy Safe Work Practices Guide