Corporate

Auto Manufacturing Risk Assessment Results

Browse through our library of WSPS policies, annual reports, strategic plans and more.

Issue link: https://www.wsps.ca/resource-hub/i/1524062

Contents of this Issue

Navigation

Page 7 of 39

8 | 130-BRT-01-IMOT A Bipartite and Collective Process ▪ Workshop process is open, transparent, and collaborative – Ensures that different perspectives or viewpoints are heard – Each response received is respected and not freely edited – Hazard list is shared with workshop participants before the workshop – Each voting participant is given the opportunity to review and validate their votes after the workshop ▪ Finding acceptable solutions that all members can support – Only industry participants vote, not regulator/HSAs – Process is not about consensus, although the results demonstrate a degree of convergence

Articles in this issue

Archives of this issue

view archives of Corporate - Auto Manufacturing Risk Assessment Results