Stumper Operation 123
1.0 Introduction 125
2.0 Hazards 125
3.0 Legislation / Safe Work Practices 125
4.0 Mandatory Information / Work Practices 126
5.0 Work Practice 126
5.1 Pre-operational Checks
5.2 Stumper Operation
5.3 Emergency Shut Down of Stumper
5.4 Normal shut Down of Stumper
Clearing Saw Use 129
1.0 Introduction 131
2.0 Hazards 131
3.0 Legislation / Safe Work Practices 131
4.0 Mandatory Information / Work Practices 131
5.0 Work Practice 132
5.1 Site inspection
5.2 Cutting Operation
Use of a Mobile Crane to Remove Trees 134
1.0 Introduction 136
2.0 Hazards 136
3.0 Legislation / Safe Work Practices 136
4.0 Mandatory Information / Work Practices 137
5.0 Work Practice 138
5.1 Worksite Assessment
5.2 Worksite Setup
5.3 Arborist Work Positioning
5.4 Crane Rigging
5.4.1 Crane Rigging – Multi-leg Sling Configuration
5.4.2 Crane Rigging – Single Sling Configuration
5.5 Cut Section
Page 7