ASWP03 Ascending Trees 7.1.2 Interim Anchor Point Repositioning Arborist Life Line Once the arborist has climbed to an interim anchor point the following actions apply for continuing ascent. Step Action Secure to tree using a work positioning lanyard Place work positioning lanyard around the main stem of the tree or a suitably strong limb and connect to side "D" rings of arborist belt Ensure that the work positioning lanyard is secure Check snaps, place weight into lanyard Communicate to Belayer Receive and confirm e.g. "On/Off Belay" Reposition arborist life line to next interim anchor point The worker may use a rope poking tool or throwing knot to advance the rope up the tree. Secure arborist life line to fall protection saddle Secure life line using a termination knot or connector to appropriate load rated attachment point of saddle or fall protection harness. Test belay is secure Climber slowly places weight into system. Belayer must ensure that the arborist is secured, there must be no movement of the arborist life line through the mechanical fall arrestor or a friction hitch Belayer communicates that arborist is secured Release work positioning lanyard Continue ascent Repeat interim anchor point process until reaching the final anchor point Page 34

Articles in this issue

Archives of this issue

view archives of Guides & Toolkits - Arborist Industy Safe Work Practices Guide