ASWP16 Use of a Mobile Crane to Remove Trees 5.4 Crane Rigging Step Action Determine load Communicate with crane operator intended sling location and cut location Determine weight of load to be cut using Green Wood Weight Charts, rules of thumb etc. Relay weight of load to crane operator Crane operator decides if load is within their lifting capabilities Crane operator communicates acceptance or rejection of proposed cutting location based on whether load is within their capabilities Crane operator and worker aloft will agree on the final cutting location Set choker around section of tree Ensure choker is secured to tree 5.4.1 Crane Rigging – Multi Leg Sling Configuration Step Action Secure one leg of sling to limb Multi leg Sling Configurations Place choker so that headache ball is over the centre of gravity of the limb Ensure that the Safe Working Loads (SWL) of the sling is not encroached Ensure that when sharp angles are placed on connection between slings and load the Safe work Load (SWL) is not compromised Utilize a Sling Angle Load Chart Ensure bend ratios for slings are not exceeded Secure second leg of sling to limb Ensure that there is no slack in the multi leg sling configuration Page 141

Articles in this issue

Archives of this issue

view archives of Guides & Toolkits - Arborist Industy Safe Work Practices Guide