ASWP16 Use of a Mobile Crane to Remove Trees
Contents
1.0 Introduction
2.0 Hazards
3.0 Legislation / Safe Work Practices
4.0 Mandatory Information / Work Practices
5.0 Work Practice
5.1 Worksite Assessment
5.2 Worksite Setup
5.3 Arborist Work Positioning
5.4 Crane Rigging
5.4.1 Crane Rigging – Multi-leg Sling Configuration
5.4.2 Crane Rigging – Single Sling Configuration
5.5 Cut Section
Page 135