Guides & Toolkits

Arborist Industy Safe Work Practices Guide

This Stream includes all of our Guides & Toolkits Flipbooks.

Issue link: https://www.wsps.ca/resource-hub/i/1490496

Contents of this Issue

Navigation

Page 88 of 163

ASWP08 Fertilizing and Aerating Soils for Woody Plants Step Action Lightening protection Cracks Drill hole to appropriate depth • Hold drill firmly to reduce potential for jamming and twisting of drill Implant capsule • Watch for pinch points 5.5 Trunk Injection Method - Fertilization Step Action Inspect tools / equipment Inspect for: Sharpness Cracks Pressure system for operation Inspect pressure system Inspect for: Leaks Connections Drill appropriate depth / width into tree • Hold drill firmly to reduce potential for jamming and twisting of drill Implant tip of system • Watch for pinch points Pressurize the system • Check for leaks Remove tip • Cover microinjecting unit with one hand and pull out slowly • Wear safety glasses during this operation Dispose of tip / clean equipment • Follow appropriate directions from the manufacturer's instruction 5.6 Aerating Soils Step Action Inspect work site Assess for underground obstructions such as: Sprinkler system Electrical system Communication conductors Page 89

Articles in this issue

Archives of this issue

view archives of Guides & Toolkits - Arborist Industy Safe Work Practices Guide