Guides & Toolkits

Arborist Industy Safe Work Practices Guide

This Stream includes all of our Guides & Toolkits Flipbooks.

Issue link: https://www.wsps.ca/resource-hub/i/1490496

Contents of this Issue

Navigation

Page 142 of 163

ASWP16 Use of a Mobile Crane to Remove Trees Step Action requires the crane operator to break wood by creating lateral movements to the stem being cut through the boom and hoist line. This action can apply a great deal of stress to crane components. Remove branches above the work location to ensure that other branches do not strike the worker Use appropriate fall protection with chain saw use Ensure severed limbs are removed appropriately Communicate to crane operator "beginning cut" Ensure crane operator has heard and responds Perform chain saw cut Operate chain saw from the escape route side of the stem Make a controlled cut Monitor movement of tree stem Communicate with crane operator to adjust lifting tension and or movement or direction to release tension on section as needed Reposition to escape route/method Worker aloft moves to escape route/method Worker communicates to crane operator to take the load Crane operator takes load and lowers to ground Ensure load is moved away from climber and not over the climber's head Ensure load is not transferred over ground workers Remove choker(s) from cut section on ground Secure load from movement prior to releasing choker(s) Be aware of potential swing of headache ball Remove the choker(s) from the headache ball hook Remove the choker from the tree section Replace the choker on the headache ball Remove butt/guide ropes as necessary Do not use crane to free slings that are stuck. Re- position loads to free slings Page 143

Articles in this issue

Archives of this issue

view archives of Guides & Toolkits - Arborist Industy Safe Work Practices Guide