Guides & Toolkits

Turkey Safe Work Practices Manual

This Stream includes all of our Guides & Toolkits Flipbooks.

Issue link: https://www.wsps.ca/resource-hub/i/1317310

Contents of this Issue

Navigation

Page 31 of 71

JUNE 2013 WORK PRACTICE CLEANING SECOND FLOOR Inspect cleanout openings (fl oor holes and wall openings) Elevate cleanout equipment to second or third fl oor (See next page for specifi c details on acceptable elevating options) Manure cleanout Second and third fl oor washing Lower cleanout equipment and replace fl oor coverings STEP ACTION Locate pass through holes and clear litter from over the fl oor covering. Remove fl oor panel and secure guard rail system around clean out hole. OR Secure guard rail across sidewall openings. Use acceptable method to get cleanout tractor on second fl oor: ■ backing up ramp; ■ winching up ramp; ■ lifted with loader; or ■ overhead lift winch. Scrape manure with cleanout tractor towards openings. After all the manure has been removed, pressure wash to clean all barn surfaces. Scrape or sweep water towards fl oor openings. When all cleaning is complete on second or third fl oor: ■ lower cleanout tractor to ground elevation using same method as above; ■ remove safety guard rail around second/third fl oor opening; and ■ replace and secure fl oor panel over cleanout hole. 30

Articles in this issue

Archives of this issue

view archives of Guides & Toolkits - Turkey Safe Work Practices Manual